Every roof we energise is a power plant that needed no land, no fuel and no transmission line.

Rooftop solar is the fastest, cleanest capacity the Philippines can add. Here is what our installed base does, and how we count it.

30,807tonnes CO₂ / year

avoided each year by 32.6 MWp of Magnus-built capacity, as of September 2026.

An estimate based on design yield, not metered generation.

Three commitments

Build safely.

Zero lost-time-injury target on every site; full fall-protection on every roof.

Build locally.

Crews, engineers and warehousing are Filipino and regional — Dumaguete, Cebu, Luzon, Mindanao.

Build for everyone.

From the “Solar for every Juan” lease-to-own campaign (2023) to schools and community hospitals, we take on projects that larger developers pass over.

Community

Talk to an engineer, not a salesperson.

Send us your address and a recent electricity bill. We’ll come back with a preliminary design and an indicative proposal.