How it works

  1. Step 1

    Site assessment

    Roof structural review, shading analysis, load-profile study, interconnection check with your distribution utility.

  2. Step 2

    Design

    PV layout, structural attachment design, electrical single-line, simulation (Helioscope/PVsyst), permitting pack.

  3. Step 3

    Procurement

    Tier-1 modules and inverters, sourced directly; we import and warehouse our own mounting and BOS.

  4. Step 4

    Construction

    Our own crews, full-PPE, QA checkpoints at mounting, stringing, and commissioning. Roughly six months from notice-to-proceed for a typical C&I site.

  5. Step 5

    Commissioning & handover

    Utility witnessing, net-metering activation where applicable, as-built drawings, monitoring portal, training for your facilities team.

What you get

  • Turnkey plant
  • Performance-tested commissioning report
  • As-built documentation
  • Optional O&M from day one